U.S. 26 Construction Begins

Vestige of better days: ferns and moss are gradually erasing the long-abandoned original loop highway on Laurel Hill

Vestige of better days: ferns and most are gradually erasing the long-abandoned original loop highway on Laurel Hill

Over the past few years, I’ve posted a series of articles in this blog challenging the Oregon Department of Transportation “safety” projects for U.S. 26 in the Mount Hood area. Most of the projects to date have been highway widening cloaked as “safety”, and ODOT has been incrementally widening the highway to five lanes from west of Wemme through Rhododendron over the past decade.

Today, they’ve set their sights on the Laurel Hill section of the highway, where extensive sections of the mountainside will soon be blasted away, ostensibly to prevent rocks from falling on the highway. But as always, the highway “will be widened for safety”.

The big road cut in the center of this Google Earth view will get even bigger with the latest ODOT project

The big road cut in the center of this Google Earth view will get even bigger with the latest ODOT project

The current batch of projects aren’t as bad as they might have been: working from a solid “F” grade as originally rolled out, they’ve moved somewhere into the “D-” range. The project is still a costly dud to taxpayers, approaching $40 million and counting. But the extent of new lanes has been scaled back somewhat and the center median has also been shortened on the west end from what was originally conceived.

Sadly, ODOT can do better — and has, especially in the Columbia River Gorge, where their excellent I-84 Strategy guides design. But on Mount Hood the focus has been on moving traffic, with impacts on the scenic character of Oregon’s tallest peak as an afterthought.

This slope across from the Mirror Lake trailhead will be blasted away to allow for road widening

This slope across from the Mirror Lake trailhead will be blasted away to allow for road widening

For Mount Hood travelers, it’s going to be a radical change. Not only will the physical highway scars on Laurel Hill grow substantially, the road itself will be more freeway-like, thanks to a concrete center median that will stretch four miles from the Kiwanis Camp junction at the bottom of the hill to Government Camp.

While the new median will physically prevent the relatively rare head-on crashes that can occur in winter conditions (when heavy ski traffic is present), ODOT has no shown plans to actually lower the speed limit in this stretch of highly. This would be the most cost-effective way to prevent crashes, and was recommended as a priority by their own safety consultants, but couldn’t compete with the road widening agenda.

You Can’t Get There from Here

The most obvious impact of the new median will be visual. ODOT has been vague about just how ugly the median will be. There are many examples across the country where state highway departments have constructed reasonably attractive median barriers in scenic corridors. Yet, while early ODOT materials on the project suggested a similar approach at Mount Hood, the agency seems to be retreating to a standard Jersey barricade, like you might find on the Banfield Freeway.

The Laurel Hill Chute historic site will be a lot harder to reach for westbound tourists

The Laurel Hill Chute historic site will be a lot harder to reach for westbound tourists

The "improved" highway will allow fewer visitors to take in this mind-boggling view of the "chute" used by Oregon Trail pioneers to descend Laurel Hill

The “improved” highway will allow fewer visitors to take in this mind-boggling view of the “chute” used by Oregon Trail pioneers to descend Laurel Hill


 

Another impact from the medians that will affect hikers is access to the popular Mirror Lake trailhead and Laurel Hill Chute trail. Once the median is in place, hikers will have to approach from the west to reach these trails, which means that if you are approaching from Government Camp, you would need to drive four miles down Laurel Hill to the Kiwanis junction, turn around and retrace your route to Laurel Hill or Mirror Lake.

Likewise, the hordes of Portlander who fill the Mirror Lake trailhead, in particular, will need to drive to Government Camp or Ski Bowl to make their return trip, as turning west from the trailhead will no longer be possible.

This is Going to Take Awhile

This latest phase of the U.S. 26 widening project begins this summer, and, according to ODOT, will continue through 2016 in the months of April-October each year! ODOT warns travelers that intermittent traffic closures during these construction windows will last 20 minutes and can occur at any time when construction is underway — longer when blasting occurring.

Here’s a rundown of the details from ODOT:

• Around-the-clock closure to one lane in each direction until October 31, 2015
• Blasting will require up to 1-hour closures of U.S. 26 three days a week Monday through Thursday between 5:30 p.m. to 7:30 p.m.
• Intermittent traffic stops lasting 20-minutes anytime
• Increased truck traffic on U.S. 26
• Intermittent single lane closures and flagging for other work
• No construction on holidays and Sundays
• No construction from November to March of each year. During this time all existing lanes will re-open

If that last point leaves no doubt, this project continues spend a lot of general fund dollars on ski traffic — and the reckless driving associated with ski traffic — during winter weekends.

Finding a New Vision for US 26

The “good” news (ironically) is that ODOT is rapidly running out of highway funding. This reality is statewide, thanks to the declining value of a cents-per-gallon gas tax losing ground to inflation and the Oregon Legislature increasingly bonding away future gas taxes to pay today’s bills. It’s a sad state of affairs for transportation in Oregon, but it might also provide a needed opportunity for ODOT to develop a more holistic vision for the Mount Hood corridor.

The agency knows how to do this: ODOT’s I-84 Strategy for the Columbia Gorge guides project design in the National Scenic Area and is a perfect approach for coming up with a more enlightened, sustainable vision for the Mount Hood corridor, as well.

ODOT's excellent I-84 Strategy is a perfect blueprint for a new U.S. 26 vision on Mount Hood

ODOT’s excellent I-84 Strategy is a perfect blueprint for a new U.S. 26 vision on Mount Hood

One very encouraging development is the Mount Hood Multimodal Plan, reported on here in an earlier article. While past efforts to actually manage the ski traffic that drives so many bad highway design decisions in the corridor haven’t gone anywhere, the new plan seems to have legs. That’s good news for Mount Hood at a time when good news is in short supply.
_______________

For more information about the U.S. 26 project and ODOT:

U.S. 26 Website

I-84 Strategy(PDF)

Previous WyEast Blog articles on the U.S. 26 project:

Highway 26 Widening – Part One

Highway 26 Widening – Part Two

Highway 26: Last Chance to Weigh in!

Highway 26 Postscript… and Requium?

Ski Traffic & the Loop Highway: Part 1

Ski Traffic & the Loop Highway: Part 2

One thought on “U.S. 26 Construction Begins

  1. It sure makes me wonder what political/economic connections there must be between ODOT and those that benefit from such a waste of money. I love how we gone stupid with “safety.” Nothing is “safe” enough, and nothing will ever be 100% safe, but the morons in charge at ODOT are indifferent.

    I’d love to interview some of the decision makers. I can think of a number of roads that could use repaving, and lane striping, to improve night safety, and they are here in the metro area, not on Hood.

    I agree with your point about either lower speed limits, or how about just common sense. However the “agenda” continues, blow all the money, raise taxes, and eventually privatize/toll road$, all while the higher ups at ODOT could care less to make waves, gotta enjoy that BIG retirement money, so don’t dare start a feud.